Criterion 1 : Site selection 


Mandatory clause :  The site plan must be in conformity with the development plan/master plan/UDPFI guidelines (mandatory). This should comply with the provisions of eco-sensitive zone regulations, coastal zone regulations, heritage areas (identified in the master plan or issued separately as specific guidelines), water body zones (in such zones, no construction is permitted in the water-spread and buffer belt of 30 metre minimum around the FTL), various hazard prone area regulations, and others if the site falls under any such area (mandatory with no point allocation). responsibility: Project Manager, Architect


Optional clause : The site should be located within ½ km radius of an existing bus stop, commuter rail, light rail or metro station and/or the proposed site must be a Brownfield site (to rehabilitate damaged sites where development is hindered by environmental contamination, thereby reducing pressure on undeveloped land) (1 point) responsibility: Project Manager, Architect
Reply


Messages In This Thread
Criteria’s for the assessment of Green Projects - by soniya - 01-17-2015, 10:08 AM
RE: Criteria’s for the assessment of Green Projects - by soniya - 01-17-2015, 10:20 AM
RE: Criteria’s for the assessment of Green Projects - by soniya - 01-17-2015, 10:21 AM
RE: Criteria’s for the assessment of Green Projects - by soniya - 01-17-2015, 10:23 AM
RE: Criteria’s for the assessment of Green Projects - by soniya - 01-17-2015, 10:25 AM
RE: Criteria’s for the assessment of Green Projects - by soniya - 01-17-2015, 10:26 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)