Metro Station Performance Requirements
#1

Performance Requirements

Centralized control of the Station E&Ms.

All Stations shall have a dedicated central management unit of all major E&M equipment so that the maintenance staff can have control over them.

The equipment under local central command shall include the following as a minimum:

(i) The entrance closing gates of the Station;
(ii) lighting; and
(iii) escalators and lifts.

The local central management unit shall be the relay to the OCC

For dealing with Emergency, the control should also have the following:

(i)An Emergency procedure information system;
(ii)a means of monitoring fire detection systems;
(iii)a means of summoning Emergency services;
(iv)communication system;
(v)public address system;
(vi)a means of monitoring operation of lifts, escalators, ticket barriers and other equipments; and
(vii)CCTV monitoring of all Station areas.

Front Desk Architects
www.frontdesk.co.in
Email: architect@frontdesk.co.in , Tel: +91 0141 2743536
Reply


Forum Jump:


Users browsing this thread: 1 Guest(s)